The Challenge for BPLocation: Wamsutter, Wyoming. Challenge: Identify fractures in one of the largest gas producing assets in North America in order to optimize a multi-year, 1.2 billion dollar development drilling program. Key objectives: efficient acquisition to comply with tight timeline, minimize environmental disturbance, minimize HSE risk, and obtain densely sampled, full-wave seismic images.